A leading manufacturer of commercial explosives worked with the DPA team to reduce die changeover time for production of the company’s shock tube lines.
If you’re responsible for pharma manufacturing operations - examine these six factors in your pharmaceutical facility’s process definition and controls.
We recently worked with a pharma client using DPA’s six-factor assessment tool. The client had received an FDA 483 Inspectional Observations report, detailing several conditions and findings that put the
“Baseball is a simple game. You throw the ball. You catch the ball. You field the ball.” – Durham Bulls coach Larry Hockett, from the movie Bull Durham.
A global manufacturer of aircraft and gas turbine components retained DPA to conduct a Kaizen event that would reduce the 18 hours required for the set-up of a key machine.
Identifying risks to product quality and other supply chain issues of logistics and costs reduces lead times by 60%, cell layout boosts capacity by 107%.